The project consists of building a new flyover ramp and bridge connecting southbound Airport Connector to eastbound 215, widening the off-ramp from eastbound 215 to Warm Springs Road and construction of a new bridge for that off-ramp, and the widening of a bridge carrying westbound 215 traffic over the Airport Connector. The expected completion date for the entire project is late 2017.
Aztech observes the placement of all soil types in addition to the sampling and testing for backfill and roadbase. Aztech conducts concrete batch plant inspections and samples the concrete aggregates and also performs the sampling and testing of the concrete in the field. We also perform the roles of Street Inspector and Plant Inspector for hotmix asphalt as well as the sampling and density testing. Aztech also performs all of the required laboratory testing for this project.